Projects > Capacity expansion Finishing Line 1

Capacity expansion Finishing Line 1

Customer
TSTG Schienentechnik GmbH
Plant
Finishing Line 1
Services

Planning, delivery, turnkey construction and commissioning of electrical systems for capacity expansion of Finishing Line 1.

120 m rails are examined here and prepared for delivery.

The plant consists of two roller conveyers, each 280 m long, and a total of 134 roller conveyor drives, a loading bed with 20 individual tracks and a checkpoint for quality control of the rails.

Control is realised with a Siemens S7-400 secure PLC control system.

The drives are actuated by Siemens Micromaster frequency converters.

Signals (approx. 2500) within the switchgear system and along the roller conveyors are processed by secure WAGO stations.